SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)







SRIPADA SAGAR PROJECT
PKG
No.
Description
Awarded
Bid Amount
Rs. in Crs.
1
Construction of Sripada Sagar Project acress Godavari river at Yellampally (V), Ramagundam(M), Karimnagar Dt.
(Stage-I) 
SCANSKA Cementation Ltd.
408.85
2
Excavation of approach channel Construction of pump house, Supply and commissioning of pumping machinery to lift 8.5 TMC, Transformers, sub-stations, Pressure mains Supply and layers of pipelines from Barrage to NTPC Balancing Reservoir.
M/s.Subhash Projects & Marketing(P) Ltd.

98.92
3
Stage-II, Phase-I of Sripada Sagar Project- supply, installation and commissioning of pumping machinery, transformers, sub-stations, pressure mains including construction of pump house all civil structures to irrigate 2.00 Lakh acres in upland areas of Karimnagar (Dist.)
M/s. IVRCL-SEW-   Navayuga (JV)
1737
TOTAL
2244.77
SRIPADASAGAR   L. I.  SCHEME

1
Project Profile
:
i)Construction of Sri Padasagar Project across river Godavari (St-I) Ph-I
ii)Supply of 8.5 TMC of water to NTPC (St-I, Ph-II)
iii)Lifting 12 TMC to irrigate 2 Lakh Acres (St-II, Ph-I)
2
Administrative Sanction
:
G. O. Ms. No. 71, I & CAD (PW) GVI, Dt: 16-7-2004 for Rs. 900 Crores
3
No. of EPC Packages  :   3 Nos.
4
Agt. Value of  3 Pkgs
:
Rs. 2244.77Crs.
5
Budget Provision for 2006-07  (For GWUA)
:
Rs. 1240 Crs.
6
Expenditure of the Project
         2004-05
:
Rs. 20.44  Crs.
2005-06
:
Rs. 202.07 Crs.
TOTAL
:
Rs. 222.51 Crs.
7
Utilisation ( Stg-I, Ph-I, Ph-II & Stg-II,Ph-I)
:
20.5 TMC
Ultimate
:
180.50 TMC
8
Ayacut
New Ayacut
:
2,00,000 acres
9
Lift-I
Lift Height
:
96 M
No. of Pumps
:
4 Nos.
Total pumps capacity
:
10.8 MW
10
Lift-II
Lift Height
:
120 M
No. of Pumps
:
4 Nos.
Total pumps capacity
:
13 MW
11
Lift-III
Lift Height
:
80 M
No. of Pumps
:
4 Nos.
Total pumps capacity
:
5,25 MW x 2, 8.26 MW x 2
12
Lift-IV
Lift Height
:
50 M
No. of Pumps
:
2 Nos.
Total pumps capacity
:
0.50 MW
13
Power required (Stg-I, Ph-II) – water supply to NTPC
:
9 MW
14
Power required (Stg-II, Ph-I) – Irrigation 2L Acs
:
137 MW
15
Land Acquisition
  Required
:
15,981 acres
Acquired
:
430 acres
Requisitioned
:
15,981 acres
16
Est. Cost for LA
:
Rs. 222.00 Crores
17
Est. Cost for R & R
:
Rs. 500.00 Crores
18
Mobilisation Advance
:
Paid  Recovered
2004-05
:
Rs. 20.44 Crs.
2005-06
:
 Rs.106.05 Crs.     3.31 Crs.
Total
:
 Rs. 126.49 Crs.       3.31 Crs.
19
Target date for completion
:
10/2007


SRIPADASAGAR PROJECT

Package No. 1 : (Stg-I Ph-I) Construction of Sripada Sagar Project across Godavari river at Yellampally (V), Ramagundam(M), Karimnagar Dt. to store 20 TMC at FRL + 148M.


Name of the Contractor  : ITD Cementation India Ltd.
Agreement Amount   : Rs. 408.85Crs.
Agreement Date  : 07-11-2004/17-2-2005
Period of Completion  : 36 Months(10 milestones)
Date of completion  : 06-11-2008
 
   
SRIPADASAGAR PROJECT                                                                             Water Supply to NTPC 

Package No.2 : (Stg-I Ph-II)
i)Excavation of approach channel
ii)Construction of pump house
iii)Supply and commissioning of pumping machinery to lift 8.5 TMC, Transformers, sub-stations
iv)Pressure mains
v)Supply and laying of pipelines to NTPC Reservoir
 
Name of the Contractor  : M/s.Subhash Projects &         Marketing(P) Ltd.
Agreement Amount   : Rs. 98.92 Crs.
Agreement Date  : 07-04-2005
Period of Completion  : 18 Months (6 milestones)
Date of completion  : 06-10-2006
 
SRIPADASAGAR PROJECT (Stg-I, Ph-II)                                                                             Water Supply to NTPC
 
1
Expenditure
2005-06
Works
:
Rs. 7.53 Crs.
Mob. Adv.
:
Rs.4.95 Crs.
Total
:
Rs. 12.48 Crs.
2
Land Acquisition
Total Required
:
55 acres
Acquired
:
Nil
Requisitioned
:
15 Acres
3
Utilization
:
8.5 TMC
4
Lift-I
Lift Height
:
50 M
No. of Pumps
:
4
Total pumps capacity
:
3300 HPs.
5
Power required
:
9 MW

SRIPADASAGAR  PROJECT       
STAGE-II, PHASE-I (Irrigation)

SALIENT FEATURES :
1
PROJECT PROFILE
Installation and commissioning of pumping machinery, transformers, sub-stations, pressure mains including construction of pump house all civil structures to irrigate 2.00 Lakh acres in upland areas of Karimnagar (Dist.)
2
Admn. Sanction
:
G. O. Ms. No. 149, I & CAD, Dt: 16-8-2005 for Rs. 1688.86 Crores
3
Expenditure
2005-06
:
Rs.146.44 Crs.
4
Land Acquisition
Total Required
:
15,000 acres
Acquired
:
Nil
Requisitioned
:
407 Acres
5
Forest Land
:
285 Acres
6
Utilisation
:
12 TMC
7
Ayacut
New Ayacut
:
2 Lakhs acres
Stabilisation
:
8
Lift-I
Lift Height
:
96 M
No. of Pumps
:
4 Nos.
Total pumps capacity
:
10.8 MW
9
Lift-II
Lift Height
:
120 M
No. of Pumps
:
4 Nos.
Total pumps capacity
:
13 MW
10
Lift-III
Lift Height
:
80 M
No. of Pumps
:
4 Nos.
Total pumps capacity
:
5,25 MW x 2, 8.26 MW x 2
11
Lift-IV
Lift Height
:
50 M
No. of Pumps
:
2 Nos.
Total pumps capacity
:
0.50 MW
12
Power required
:
137 MW
13
Mobilisation Advance 2005-06
:
Paid  Recovered
Rs. 85.50Crs  Rs. 3.31Crs.
SRIPADASAGAR PROJECT